Go back to the Parramatta Road Corridor Stage 1 main page.
Summary
The Post‑Gateway Documents for the Parramatta Road Corridor Stage 1 set out all revised technical studies and planning materials required after the Gateway Determination. They include the updated Planning Proposal, LEP maps, urban design reviews, heritage and economic assessments, flood risk modelling, site investigations, aircraft noise and sustainability studies, and traffic and transport analysis, showing how Council refined the proposal to meet statutory requirements across the Leichhardt, Taverners Hill and Kings Bay/Croydon precincts.
Planning Proposal Parramatta Road Stage 1 - Post Gateway
Appendix 1 - Proposed LEP Maps
Appendix 2B - Inner West Council's Draft Structure Plan 2020
Appendix 2C - Leichhardt Council's Urban Design Study 2016
Appendix 3 - Heritage Study and Inventory Sheets
Appendix 4 - Economic Assessment
Appendix 6 - Preliminary Site Investigations
Appendix 7 - Aircraft Noise Assessment
Appendix 9 - Parramatta Rd Stage 1 Sustainability Study
Appendix 8 - Draft Affordable Housing Contribution Scheme
Appendix 11 - Proposal Justification Study Post Gateway
Appendix 10 - Traffic and Transport Study
Appendix 12 - Parramatta Road UAIP Masterplan
Draft Development Control Plan Amendments
Page last updated: 26 Jun 2026