GreenWay Masterplan

A 10‑year plan to turn the GreenWay into a connected ecological, cultural and active‑transport corridor.
The GreenWay Masterplan sets out a 10‑year vision to transform the GreenWay corridor into an integrated ecological, cultural and active‑transport route. It guides $57 million in landscaping and infrastructure works to enhance recreation, connectivity and environmental outcomes along the corridor.

The GreenWay Masterplan was adopted by Inner West Council on 14 August 2018.  Its aim is to:

  • guide the delivery of landscaping and infrastructure within the GreenWay corridor over the next 10 years
  • establishes the GreenWay as an integrated ecological and active transport corridor for a range of passive and active recreation opportunities
  • incorporate local places for culture and art

The Masterplan includes proposals for $57 million of works to be implemented over the long term. 

Additional works outlined in the Masterplan will be delivered in a staged approach over the next 10 years. 

Documents

GreenWay Review of Environmental factors
Greenway REF Appendix A Concept Design Part 1
Concept design showing upgrades to shared paths, access, landscaping and public spaces along the northern GreenWay section.
Greenway REF Appendix A Concept Design Part 2
Refined layouts for cycling and walking corridors, lighting, and environmental improvements through one of the most constrained section
Greenway REF Appendix A Concept Design Part 3
Design concepts for path alignment, local connections, tree planting and ecological restoration
Greenway REF Appendix B Geotechnical Investigation Part 1.
Provides ground condition assessments, soil properties, geotechnical constraints, and foundation recommendations to inform safe construction along the corridor.
Greenway REF Appendix B Geotechnical Investigation Part 2
Greenway REF Appendix B Geotechnical Investigation Part 3
Greenway REF Appendix C Soils and Contamination
Greenway REF Appendix D Flood Impact Assessment
Greenway REF Appendix E Flora and Fauna
Greenway REF Appendix G Arboricultural Impact Assessment Part 1
Greenway REF Appendix F Biodiversity Development Assessment
Greenway REF Appendix G Arboricultural Impact Assessment Part 2
Greenway REF Appendix H Aboriginal Due Diligence
Greenway REF Appendix I Statement of Heritage Impact Assessment
Greenway REF Appendix J Noise and Vibration Assessment
Greenway REF Appendix K Landscape and Visual Assessment Part 1
Greenway REF Appendix K Landscape and Visual Assessment Part 2
Greenway REF Appendix K Landscape and Visual Assessment Part 3
Greenway REF Appendix L Engagement Outcomes Report 
Page last updated: 24 Mar 2026