Inner West Council public domain works – standard drawings list
What you need to consider
All works on roads or footpaths require an application for a permit from Council before you start any work. If you require any more information or need to download any application form please visit the following pages.
For any Road or Footpath application forms visit the Works within Road and Footpath page.
For any driveway application forms (Step 1 Design Approval or Step 2 Permit for Construction) visit the driveways page.
The engineering standard drawings provide the detailed information you'll need to design, construct or reinstate any public domain works.
Disclaimer
Inner West Council and its employees accept no responsibility for any loss, damage, claim, expense, cost or liability arising with referencing and/or reliance on the standard drawings. It is expected that these standard drawings will be redrawn by a suitably qualified person referencing the information and responding to specific site or project conditions/requirements. Council's standard drawings may be subject to revision. Accordingly, users need to ensure that when adopting any standard drawing that it is the current version. Whilst all care has been taken to provide the most accurate and current standard drawings, it is the responsibility of the person referencing the drawings to ensure that the requirements of all relevant Australian Standards and guidelines are being met.
| Title | Size | Version | Remarks |
|---|---|---|---|
| IWC Standard Drawing Combined (PDF, 13.88MB) | A3 | Oct 19 | Current |
The above combined standard drawing set comprises the individual drawings listed below.
| Title | Size | Version | Remarks |
|---|---|---|---|
| C1 Standard Cycleway Detail (PDF, 383.39KB) | A3 | Oct 19 | Current |
| Title | Size | Version | Remarks |
|---|---|---|---|
| D1 Grated Gully Pit with extended EKI (PDF, 394.65KB) | A3 | Oct 19 | Current |
| D2 Junction Pit (PDF, 339.79KB) | A3 | Oct 19 | Current |
| D3 Extended Junction Pit (PDF, 404.49KB) | A3 | Oct 19 | Current |
| D4 Surcharge Pit with apron (PDF, 374.79KB) | A3 | Oct 19 | Current |
| D5 Surcharge Pit without apron (PDF, 396.36KB) | A3 | Oct 19 | Current |
| D6 Step Iron Details (PDF, 115.80KB) | A3 | Oct 19 | Current |
| D7 Embedding and Road Restoration for Pipe Installation (PDF, 370.48KB) | A3 | Oct 19 | Current |
| D8 Standard Subsoil Drains (PDF, 676.12KB) | A3 | Oct 19 | Current |
| D9 Bandage Joint & Minor Pipe Connection to Stormwater Pipe Detail (PDF, 275.76KB) | A3 | Oct 19 | Current |
| D10 Kerb stormwater outlets (PDF, 274.81KB) | A3 | Oct 19 | Current |
| Title | Size | Version | Remarks |
|---|---|---|---|
| E1 Sediment & Erosion Control Plan (PDF, 1.52MB) | A3 | Oct 19 | Current |
| Title | Size | Version | Remarks |
|---|---|---|---|
| F1 80 mm thick un-reinforced concrete footpath (PDF, 500.86KB) | A3 | Oct 19 | Current |
| F2 100 mm thick reinforced concrete footpath (PDF, 452.38KB) | A3 | Oct 19 | Current |
| F3 150 mm thick reinforced concrete footpath (PDF, 349.21KB) | A3 | Oct 19 | Current |
| F4 Kerb Ramps (PDF, 354.58KB) | A3 | Oct 19 | Current |
| F5 Standard bus stop arrangements (PDF, 457.60KB) | A3 | Oct 19 | Current |
| F6 Brick Paved Footpath (PDF, 437.58KB) | A3 | Oct 19 | Current |
| F7 Paved Footpath (PDF, 413.98KB) | A3 | Oct 19 | Current |
| F8 Bin footing, seat footing and tree details (PDF, 308.28KB) | A3 | Oct 19 | Current |
| F9 Asphaltic Concrete Paved Footpath (PDF, 282.82KB) | A3 | Oct 19 | Current |
| Title | Size | Version | Remarks |
|---|---|---|---|
| R1 Standard Kerb Profiles (PDF, 1.45MB) | A3 | Oct 19 | Current |
| R2 Concrete Road Slab Replacement Work (PDF, 1.09MB) | A3 | Oct 19 | Current |
| R3 Vehicle Crossing & Layback Details (1) (PDF, 809.96KB) | A3 | Oct 19 | Current |
R4 Vehicle Crossing & Layback Details (2) (PDF, 374.20KB) For suburbs: Annandale, Balmain, Balmain East, Birchgrove, Leichhardt, Lilyfield & Rozelle | A3 | Oct 19 | Current |
| R5 Standard Flexible Road Pavements - Reconstruction with asphaltic conc. Over DGB (PDF, 352.24KB) | A3 | Oct 19 | Current |
| R6 Standard Flexible Road Pavements - Full Depth asphaltic concrete road pavements (PDF, 341.52KB) | A3 | Oct 19 | Current |
| R7 Asphaltic concrete Road heavy patching (PDF, 335.46KB) | A3 | Oct 19 | Current |
| Title | Size | Version | Remarks |
|---|---|---|---|
| T1 Pedestrian Crossing on a Flat Top Road Hump (PDF, 1,007.72KB) | A3 | Oct 19 | Current |
| T2 Watts Profile Speed Humps & Asphalt Speed Cushions (PDF, 756.82KB) | A3 | Oct 19 | Current |
- Council permits residents to make their own arrangements to paint driveway line markings as long as they follow the following set of instructions and use the below standard drawing.
- Paint 80mm wide white lines a maximum of 1.0 metre from either edge of the driveway crossing for a length of 2.0 metres (from the edge of the gutter).
- This will assist in providing visual delineation of the extremity of the permissible parking zone and the positioning of parked vehicles clear of the driveway.
| Title | Size | Version | Remarks |
|---|---|---|---|
| Driveway Line Marking Drawing (PDF, 138.48KB) | A3 | Oct 19 | Current |